Hendon School – Datapoints and Power Circuits Installation

WhatsApp Image 2024-11-05 at 13.51.59 (1)
WhatsApp Image 2024-11-05 at 13.51.59
WhatsApp Image 2024-11-05 at 13.51.59 (1) WhatsApp Image 2024-11-05 at 13.51.59

Hendon School – Datapoints and Power Circuits Installation

Last Thursday, we were back at Hendon School, where we’ve previously completed a range of electrical projects. This time, our focus was on preparing multiple classrooms and the kitchen for enhanced functionality:

  • Classrooms: We installed datapoints across multiple rooms to improve connectivity and support the school’s digital needs.
  • Kitchen: Installation of new power circuits to serve new kitchen appliances and helping with the schools change over from gas to fully electric.
  • Maintenance: General electric maintenance works including fault finding, additional power points and light fitting replacements.

These updates are designed to support both the safety and technological needs of the school, ensuring staff and students have a reliable environment for teaching and learning.

If your organization is planning upgrades and needs experienced electrical support, feel free to reach out. We’re here to help from planning to completion.

WhatsApp Image 2024-11-05 at 13.51.59 (1)
WhatsApp Image 2024-11-05 at 13.51.59
WhatsApp Image 2024-11-05 at 13.51.59 (1) WhatsApp Image 2024-11-05 at 13.51.59

Hendon School – Datapoints and Power Circuits Installation