We were in Watford last week to address an issue with electrical emergency lights that failed to meet the required three-hour runtime during a drain-down test. Reliable emergency lighting is crucial for safety, especially in a commercial setting. So we took swift action to replace the faulty units entirely.
With the new electrical system installed, the property now meets safety standards, ensuring the lights stay operational for the full three hours when they’re needed most.
If your emergency lighting hasn’t been tested or needs repair/upgrading, get in touch with us. Electrical Safety is always our top priority.