Project Overview

At High Hearts Farm, we had the opportunity to work with Equitopia and OLB Building Services, Equitopia run this renowned equestrian facility dedicated to providing exceptional care for their horses and clients.

Our team was entrusted with the task of enhancing the stables’ infrastructure by installing a new solarium, as well as installing all new distribution, small-power and LED lighting throughout the facility. This project allowed us to showcase our expertise in specialized electrical installations while also contributing to the well-being of the horses and the efficiency of Equitopia’s operations.

High Hearts Farm - Equitopia

Stephen James BMW Group - Siemens SiCharge-D EV Chargers Installation

Project Overview

Our team were thrilled to collaborate with Stephen James BMW Group, a prominent automotive dealer in the United Kingdom. We were entrusted with the task of installing state-of-the-art Siemens SiCharge-D and AC-22 EV chargers and upgrading existing infrastructure at various sites in Southern England, making Stephen James BMW Group the second location in the UK to boast this advanced charging technology, as well as being the first automotive company to have the AC-22 EV Chargers installed.

The Siemens SiCharge-D EV chargers offer numerous benefits, making them an ideal choice. These chargers are 96% more efficient compared to traditional chargers, allowing for reduced energy consumption and lower operating costs. With the capacity to simultaneously charge up to five vehicles at once, these chargers cater to the growing demand for electric vehicle infrastructure while minimizing wait times for customers. The installation of these cutting-edge chargers showcases a commitment to environmental sustainability.

Project Overview

Another collaboration with Stephen James BMW Group that entailed a new upgrade for their outdated halogen lighting system, we opted to install an LED alternative which saves up to 90% of their energy which was previously going to waste, resulting in a happier working environment for clients and staff as we optimised the new LED lights to provide a far better quality of light in comparison to their older system.

Stephen James BMW Group – Enfield Branch

Swift Aerospace – Lighting Modernisation

Project Overview

Swift Aerospace partnered with JS Electrical Contractors for a lighting modernization project, aiming to reflect their dedication to manufacturing and distributing aviation parts. Swift Aerospace sought to modernise their facility which entailed a plan to design a new energy-efficient lighting system. Our team was responsible for designing and executing a comprehensive lighting upgrade to meet these objectives.

Collaborating closely with Swift Aerospace, JS Electrical Contractors developed a contemporary lighting design that enhanced the office and warehouse space’s aesthetics and functionality. We opted for energy-efficient LED lights, offering optimal illumination and reduced energy consumption.

Project Overview

Revive Health & Fitness, a popular gym facility in Potters Bar, sought our expertise to fully rewire their new facility. Our team was tasked with creating a lighting design that would not only improve visibility and energy efficiency but also motivate and inspire gym-goers during their workouts.

We collaborated with Revive Health & Fitness to develop a lighting plan tailored to the unique requirements of a gym environment. Our team selected energy-efficient LED lights that offered optimal illumination and durability. We strategically placed the lights to highlight workout areas, minimize shadows, and create an inviting atmosphere. Additionally, we installed adjustable lighting in specific zones, such as group exercise studios, to cater to various activities and classes.

Revive Health & Fitness - Gym Full Electrical Installation

340989301_1573046546552216_3433140405587223168_n
ezgif-3-6463e06554
Skelly Photography-35-min
Capture2
Skelly Photography-30-min
Skelly Photography-24-min
Skelly Photography-26-min
340989301_1573046546552216_3433140405587223168_n ezgif-3-6463e06554 Skelly Photography-35-min Capture2 Skelly Photography-30-min Skelly Photography-24-min Skelly Photography-26-min

At High Hearts Farm, we had the opportunity to work with Equitopia and OLB Building Services, Equitopia run this renowned equestrian facility dedicated to providing exceptional care for their horses and clients.

Our team was entrusted with the task of enhancing the stables’ infrastructure by installing a new solarium, as well as installing all new distribution, small-power and LED lighting throughout the facility. This project allowed us to showcase our expertise in specialized electrical installations while also contributing to the well-being of the horses and the efficiency of Equitopia’s operations.

Our team were thrilled to collaborate with Stephen James BMW Group, a prominent automotive dealer in the United Kingdom. We were entrusted with the task of installing state-of-the-art Siemens SiCharge-D and AC-22 EV chargers and upgrading existing infrastructure at various sites in Southern England, making Stephen James BMW Group the second location in the UK to boast this advanced charging technology, as well as being the first automotive company to have the AC-22 EV Chargers installed.

Skelly Photography-180-min
Skelly Photography-103
Skelly Photography-189-min
339098867_1990660124629178_2052946699181502911_n (1)
Skelly Photography-106
Skelly Photography-180-min Skelly Photography-103 Skelly Photography-189-min 339098867_1990660124629178_2052946699181502911_n (1) Skelly Photography-106

The Siemens SiCharge-D EV chargers offer numerous benefits, making them an ideal choice. These chargers are 96% more efficient compared to traditional chargers, allowing for reduced energy consumption and lower operating costs. With the capacity to simultaneously charge up to five vehicles at once, these chargers cater to the growing demand for electric vehicle infrastructure while minimizing wait times for customers. The installation of these cutting-edge chargers showcases a commitment to environmental sustainability.

Skelly Photography-128-min
Skelly Photography-152-min
Skelly Photography-108-min
Skelly Photography-130-min
Skelly Photography-119-min
Skelly Photography-128-min Skelly Photography-152-min Skelly Photography-108-min Skelly Photography-130-min Skelly Photography-119-min

Another collaboration with Stephen James BMW Group that entailed a new upgrade for their outdated halogen lighting system, we opted to install an LED alternative which saves up to 90% of their energy which was previously going to waste, resulting in a happier working environment for clients and staff as we optimised the new LED lights to provide a far better quality of light in comparison to their older system.

Swift Aerospace partnered with JS Electrical Contractors for a lighting modernization project, aiming to reflect their dedication to manufacturing and distributing aviation parts. Swift Aerospace sought to modernise their facility which entailed a plan to design a new energy-efficient lighting system. Our team was responsible for designing and executing a comprehensive lighting upgrade to meet these objectives.

Skelly Photography-1-min
Skelly Photography-18-min
Skelly Photography-23-min
Skelly Photography-17-min
Skelly Photography-2-min
Skelly Photography-1-min Skelly Photography-18-min Skelly Photography-23-min Skelly Photography-17-min Skelly Photography-2-min

Collaborating closely with Swift Aerospace, JS Electrical Contractors developed a contemporary lighting design that enhanced the office and warehouse space’s aesthetics and functionality. We opted for energy-efficient LED lights, offering optimal illumination and reduced energy consumption.

Skelly Photography-198-min
Skelly Photography-196-min
Skelly Photography-197-min
Skelly Photography-195-min
Skelly Photography-193-min
Skelly Photography-198-min Skelly Photography-196-min Skelly Photography-197-min Skelly Photography-195-min Skelly Photography-193-min

Revive Health & Fitness, a popular gym facility in Potters Bar, sought our expertise to fully rewire their new facility. Our team was tasked with creating a lighting design that would not only improve visibility and energy efficiency but also motivate and inspire gym-goers during their workouts.

We collaborated with Revive Health & Fitness to develop a lighting plan tailored to the unique requirements of a gym environment. Our team selected energy-efficient LED lights that offered optimal illumination and durability. We strategically placed the lights to highlight workout areas, minimize shadows, and create an inviting atmosphere. Additionally, we installed adjustable lighting in specific zones, such as group exercise studios, to cater to various activities and classes.

Last week, JS Electrical completed a full light installation at a property in Stanmore, upgrading the entire building with 32W LED Galaxy lights. These bright, energy-efficient LEDs were installed throughout multiple floors, creating a well-lit and inviting atmosphere.

During the project, our team discovered that some of the existing external lighting wasn’t working on inspection the previous wiring had been routed inefficiently beneath the ground. We assessed the issue and provided a clean, effective solution to ensure that all wiring was properly installed for both safety and performance.

At JS Electrical, we pride ourselves on delivering high-quality solutions that not only improve functionality but also solve underlying issues, ensuring that our clients receive the best service possible.

WhatsApp Image 2024-10-21 at 15.22.32 (1)
WhatsApp Image 2024-10-21 at 15.22.32
WhatsApp Image 2024-10-21 at 15.22.32 (1) WhatsApp Image 2024-10-21 at 15.22.32
WhatsApp Image 2024-10-15 at 18.23.36 (2)
WhatsApp Image 2024-10-15 at 18.23.36
WhatsApp Image 2024-10-15 at 18.23.35
WhatsApp Image 2024-10-15 at 18.23.36 (1)
WhatsApp Image 2024-10-15 at 18.23.36 (2) WhatsApp Image 2024-10-15 at 18.23.36 WhatsApp Image 2024-10-15 at 18.23.35 WhatsApp Image 2024-10-15 at 18.23.36 (1)

2 years ago, JS Electrical completed a full electrical installation from scratch for Workshop Coffee and have proudly continued to support them since.

Recently, we were called back to carry out some upgrades and add new 3-phase power points to accommodate their coffee roasters.

Using the containment system we installed during our previous work, we ran new circuits to serve the 32-amp outlet and integrated datapoints, ensuring everything was connected back into the existing unit. Our team tested and inspected the circuits to ensure everything was running smoothly, keeping their setup efficient and up to code.

From lighting up their space to hiding cables within the walls, we’re committed to delivering clean and professional solutions for Workshop Coffee’s electrical needs.

#Electricallnstallation

#CommercialElectricians #WorkshopCoffee #JSElectricl

#ElectricalUpgrades #WorkspaceSafety

In March 2023, JS Electrical proudly installed the first Siemens SiCharge D-EV in the UK, a major milestone in EV charging technology. This 140kW DC charger, which can fully charge a vehicle in just 15 minutes, sets new standards for fast and efficient EV charging.

We worked closely with Siemens, the manufacturer of this advanced charger, and UKPN, who provided the new power supply, to bring this project to life. Our team installed EV infrastructure across multiple sites, including Enfield and Bromley.

This project stands as the second location in the UK to feature this cutting-edge technology and the first automotive company to install AC-22 EV chargers. The Siemens SiCharge-D EV charger is 96% more efficient than traditional options, allowing for lower energy consumption and operational costs, while being capable of charging up to five vehicles at once.

Stay tuned for more highlights from our recent projects!

#EICR #ElectricalSafety #LondonElectricians #CommercialElectricians #JSElectrical #ElectricalRepairs

Second:

We were recently called out to a newly purchased home where some electrical updates were needed. Our team relocated light switches to better fit the homeowner’s layout, added a few new ones, tucked away some loose cables in the ceiling, and ran wiring under the floorboards where necessary. It was a good opportunity to make sure everything was set up properly for the renovation.

If you’re working on a home project and need electrical adjustments, JS Electrical is here to help with the process!

#HomeRenovation #ElectricalWork #London Electricians #JSElectric

WhatsApp Image 2024-10-08 at 15.20.33 (1)
WhatsApp Image 2024-10-08 at 15.20.32 (1)
WhatsApp Image 2024-10-08 at 15.20.33 (1) WhatsApp Image 2024-10-08 at 15.20.32 (1)
WhatsApp Image 2024-10-29 at 15.20.54
WhatsApp Image 2024-10-29 at 15.21.03
WhatsApp Image 2024-10-29 at 15.20.54 WhatsApp Image 2024-10-29 at 15.21.03

We recently kicked off a significant project for a an upcoming underground restaurant in Marylebone, London. In our initial visit, our focus was on preparing the site for the transformation ahead.

Our team took the following steps to ensure a smooth start for the construction:

  • Stripped out and isolated all existing electrical services
  • Installed temporary lighting throughout the site to ensure visibility and safety during construction
  • Set up a temporary consumer unit to provide power for all ongoing building works
 

These essential measures will pave the way for our return in a few weeks, when we will complete a comprehensive electrical installation for the restaurant’s fit-out.

If your project requires reliable electrical solutions from initial preparation to final implementation, we’re here to assist. Let’s connect to discuss how we can support your next venture.

Last Thursday, we were back at Hendon School, where we’ve previously completed a range of electrical projects. This time, our focus was on preparing multiple classrooms and the kitchen for enhanced functionality:

  • Classrooms: We installed datapoints across multiple rooms to improve connectivity and support the school’s digital needs.
  • Kitchen: Installation of new power circuits to serve new kitchen appliances and helping with the schools change over from gas to fully electric.
  • Maintenance: General electric maintenance works including fault finding, additional power points and light fitting replacements.
 

These updates are designed to support both the safety and technological needs of the school, ensuring staff and students have a reliable environment for teaching and learning.

If your organization is planning upgrades and needs experienced electrical support, feel free to reach out. We’re here to help from planning to completion.

WhatsApp Image 2024-11-05 at 13.51.59 (1)
WhatsApp Image 2024-11-05 at 13.51.59
WhatsApp Image 2024-11-05 at 13.51.59 (1) WhatsApp Image 2024-11-05 at 13.51.59
WhatsApp Image 2024-11-12 at 16.38.45 (1)
WhatsApp Image 2024-11-12 at 16.38.45
WhatsApp Image 2024-11-12 at 16.38.45 (1) WhatsApp Image 2024-11-12 at 16.38.45

our team was back in Barnet, continuing our work on a residential project. This time, we installed an inline fan to improve kitchen ventilation.

Earlier this year, we completed a full rewire of the property, which included working to our customers specifications.

Every detail is part of making this home more functional and efficient. If your project needs expert electrical work, get in touch with us to see how we can help.

We were in Watford last week to address an issue with electrical emergency lights that failed to meet the required three-hour runtime during a drain-down test. Reliable emergency lighting is crucial for safety, especially in a commercial setting. So we took swift action to replace the faulty units entirely.

With the new electrical system installed, the property now meets safety standards, ensuring the lights stay operational for the full three hours when they’re needed most.

If your emergency lighting hasn’t been tested or needs repair/upgrading, get in touch with us. Electrical Safety is always our top priority.

image_2024_11_25T11_24_57_369Z
image_2024_11_25T11_24_52_412Z
image_2024_11_25T11_24_57_369Z image_2024_11_25T11_24_52_412Z
WhatsApp Image 2024-12-05 at 14.35.40
WhatsApp Image 2024-12-05 at 14.35.41
WhatsApp Image 2024-12-05 at 14.35.40 WhatsApp Image 2024-12-05 at 14.35.41

Our team was back at the Business and Technology Centre (BTC) this week for regular maintenance. Here’s what we tackled:

  • Swapped out old fittings and replaced lightbulbs to keep the space bright and welcoming.
  • Restored power to a few areas to ensure uninterrupted operation.
  • Replaced fuses to maintain electrical safety and reliability.

We’ve been providing monthly maintenance at BTC, handling everyday tasks to keep the site looking sharp and running smoothly. Occasionally, we take on larger projects, such as installing sockets, adding new lighting circuits, or setting up power feeds.

It’s always great to contribute to keeping this hub of innovation and business in top shape. If your site needs regular maintenance or larger electrical projects, let’s talk!